Project background: from isolated alarms to continuous risk assessment
DTS fire early warning for refinery and chemical-plant power cables and substations addresses the long-term safety and condition management of power cables, substations, trays, shafts, cable interlayers and areas near hot processes in refineries and chemical plants. Such assets commonly span multiple spaces, process sections or asset identifiers; risks can move along routes, equipment boundaries and structural weaknesses rather than appearing at predetermined measuring points. Key concerns include aging cable insulation, hot joints, corrosive environments, process heat sources, densely packed trays and complex fire-spread paths. Point sensors, manual inspections and video provide local evidence but may not capture the complete development of an anomaly from onset to response.
The solution uses DTS, centimeter-scale DTS and corrosion-resistant temperature-sensing cable, placing sensing fiber along the paths that need observation to create continuous, localized and replayable records. Its objective is to continuously observe cable temperature and localized heating, identify early anomalies at joints and high-load sections, and provide precise locations for fire-response zones, rather than add isolated equipment. Start design with an asset-risk inventory and verifiable monitoring objectives, then specify range, spatial resolution, sampling, sensing-cable construction, software interfaces and alarms.
Risk progression and monitoring boundaries
For power cables, substations, trays, shafts, cable interlayers and areas near hot processes in refineries and chemical plants, distinguish initiating factors, early signs, developing conditions and consequences. Risks including aging cable insulation, hot joints, corrosive environments, process heat sources, densely packed trays and complex fire-spread paths may occur independently or arise from combined load, environmental, construction and maintenance effects. Capture measurable changes in temperature, acoustics, vibration, strain or local condition and associate them with specific assets and distances.
Sensing principles and technology selection
A DTS interrogator launches short laser pulses into sensing fiber and calculates temperature along the fiber from returned Raman backscatter. Engineering value lies in continuous temperature profiles, accurate distance to anomalies, heating rates and heat-propagation direction rather than isolated readings. The sensing cable acts as both measurement medium and a long temperature array, without closely spaced power supplies along its route. This suits strong electromagnetic fields, damp or dusty locations, hazardous areas and sites with difficult maintenance access, subject to the required equipment and installation approvals.
The recommended combination is DTS, centimeter-scale DTS and corrosion-resistant temperature-sensing cable. Check monitoring distance, spatial resolution, localization accuracy, channel count, dynamic range, sampling cycle, operating temperature and communications together. Specifications should support the objective to continuously observe cable temperature and localized heating, identify early anomalies at joints and high-load sections, and provide precise locations for fire-response zones, rather than be compared individually. For long routes, prioritize signal-to-noise ratio, reliable localization and far-end stability; for localized high-risk areas, assess coupling, effective sensing length and response time.

System architecture: sensing, interrogation, software and response
The system comprises sensing cable or fiber sensors, splicing and protection units, interrogation equipment for DTS, centimeter-scale DTS and corrosion-resistant temperature-sensing cable, edge processing, application software and supervisory interfaces. Returned signals undergo quality checks, distance calibration and parameter calculation before mapping to asset records. Outputs include live curves, time-space plots, event lists, risk zones, historical trends and reports, rather than an unexplained waveform.
Integrate fire panels, substation monitoring and plant safety platforms through dry contacts or network protocols, with historical temperature reports. Define the data dictionary, time synchronization, alarm acknowledgment, offline buffering and recovery upload. For important projects, use tiered retention of raw or feature data to support incident reviews, algorithm improvement and threshold changes.
Sensing cable and field installation
Recommended installation: route fiber by substation feeder and process zone; use separate routes for multiple tray levels and increase cable contact length at joints and transition points. Installation quality directly affects results; the same interrogator can respond differently with different mounting, jacket materials and coupling. Design documents should identify start/end distances, slack loops, splice boxes, zone boundaries, fastening intervals, bend radius, pulling tension and protection.
Data analysis and graded alarms
The alarm model combines absolute temperature, rate of rise, differences between adjacent sections, differences between similar assets and duration. Establish normal baselines for season, load, ventilation and process state before detecting deviations. Centimeter-scale DTS suits small heat sources and dense localization, while standard and long-range DTS suit continuous routes. Select by asset size, cable coupling and permitted response time, rather than ranking systems solely by spatial resolution.
Initial application criteria: combine fixed-temperature, temperature-difference, rate-of-rise and persistence alarms, compensating for load, ambient temperature and process heat. Use advisory, early-warning, alarm and emergency levels, each with defined confirmation times, verification and actions. Calibrate thresholds against actual conditions during trial operation and record every revision, reason and effective date. Display position, asset name, measured value, baseline deviation, duration and supporting evidence together.

Commissioning, acceptance and performance verification
Acceptance should use zoned heating, controlled movement of heat sources and repeated tests under different operating conditions to verify localization error, response time, temperature repeatability and alarm interlocks. Heating a short length next to the interrogator alone is insufficient; sample the far end, joints, bends and positions with unfavorable heat transfer.
Maintenance and sustained effectiveness
Maintenance assessment should cover valid-alarm rates, confirmation time, false-alarm causes, missed-event reviews, closed work orders and detected trends, not just equipment uptime. Continued labeling of real events can improve recognition models and sustain practical performance after commissioning.
Integration with existing systems
Integrate fire panels, substation monitoring and plant safety platforms through dry contacts or network protocols, with historical temperature reports. Let the fiber platform handle interrogation, curve analysis and original evidence, while the supervisory system manages consolidated displays, duty workflows and work orders. Depending on the project, interfaces may use Modbus TCP, OPC UA, IEC protocols, REST APIs, message queues or dry contacts. Avoid transferring only an unexplained aggregate alarm.
Every alarm on a map, plan or process diagram should link back to original curves and historical trends. Feed dispositions from supervisory systems back into event records, closing the loop between monitoring, confirmation, response, review and threshold improvement.
Benefits, operating conditions and technical boundaries
The solution replaces sampled inspections of power cables, substations, trays, shafts, cable interlayers and areas near hot processes in refineries and chemical plants with continuous observation, retaining traceable early indications of aging cable insulation, hot joints, corrosive environments, process heat sources, densely packed trays and complex fire-spread paths. Passive fiber, electromagnetic immunity and multiple sensing locations on one fiber can reduce distributed power and maintenance requirements on long routes, at unattended sites or in hazardous environments. Locations and trends help teams narrow inspections, plan condition-based maintenance and prioritize risk.
Equipment selection and detailed design
Begin with five questions: which parts of power cables, substations, trays, shafts, cable interlayers and areas near hot processes in refineries and chemical plants require protection; which indications of aging cable insulation, hot joints, corrosive environments, process heat sources, densely packed trays and complex fire-spread paths must be detected; what localization, response and sampling performance is needed; what routing, power, communications and cabinet facilities are available; and who confirms alarms and owns the response workflow?
Then specify the combination of DTS, centimeter-scale DTS and corrosion-resistant temperature-sensing cable, cable construction, single- or double-ended optical paths, channel redundancy, software licensing and interfaces. For phased projects, reserve fiber, rack space, network addresses and platform capacity. For long-distance or multisite projects, evaluate centralized interrogation, distributed edge nodes and remote maintenance together.
Application-specific validation and limitations
Refinery power circuits often cross several environments. Temperatures of cables near hot pipes cannot be compared directly with indoor cables. Define zones using circuits, load types, surrounding heat sources and fire compartments, and associate critical cable joints clearly with asset records.
Installation inside substations must respect electrical safety boundaries. Passive sensing fiber does not replace insulation checks on mounting accessories and exit routes. Switching and production changes affect temperature trends, so display load context alongside alarms. After maintenance, recheck curves and alarm mapping at the same locations to keep measurements comparable.
Installation, optical-path calibration and acceptance checklist
Related products and technical resources
Explore the product categories below according to distance, spatial resolution, channels, response and site conditions. Published specifications support preliminary selection; final configuration must account for optical loss, installation and acceptance objectives.
Related equipment and specifications
Select the final model and installation to suit project conditions.
BLY-FT100
Centimeter-level distributed temperature sensing
BLY · DTS / DAS / BOTDA / BOTDR
BLY sensing cables
Related field cases
- Hangzhou Building J data-center cable monitoring
- Kunming Cable Group smart-cable monitoring
- Cable trench and cable tray monitoring